Your Data Centre Is an Information Asset.
BIM-driven design from feasibility to operational handover. Physical infrastructure and digital intelligence — delivered together under one contract.
Clashes Resolved in the Model. Not on Site.
ISO 19650-aligned BIM across six phases — from spatial feasibility through COBie-structured digital twin handover. LOD 100 to LOD 500 in a single persistent model.
Handover Is Not a Folder of PDFs.
Every asset, maintenance schedule, warranty record, and service history embedded in a COBie-structured model. The information asset outlives the construction project.
Phases 1–2. LOD 100–300. Spatial massing, site analysis, Tier compliance matrix, and full architectural and structural BIM — validated before a single component is procured.
Phases 3–4. LOD 350–400. 5D BIM. Automated clash detection across power, cooling, and structure. BIM-derived BOQ. 4D construction schedule linked directly to the 3D model.
Phase 5. CFD-integrated. PUE modelled across cooling configurations. Airflow validated before selection. Embodied carbon calculated pre-construction. Energy compliance documentation produced.
Phase 6. LOD 500. COBie-structured handover — all assets, maintenance schedules, and warranties embedded. Transitions to Digital Twin with IoT and DCIM integration post-handover.
Service Documentation
Get the DC Lifecycle Intelligence Service Brief
Phase framework, LOD targets, deliverables per phase, and engagement models — in a single document.