Data CenterThat Arrives Ready.
Factory-assembled. FAT-tested. Tier I–IV configurable. Connect utilities — the data centre is operational.
Tier I to IV. One Vendor.
All four Uptime Institute redundancy levels configurable from a single contract. Air-cooled or liquid-cooled — specified at order, engineered to your rack density.
Deployed in Weeks. Not Months.
Traditional DC builds take 36+ weeks on site. DEZ CDCs ship FAT-tested and commission in days. No construction — just connection.
Tier I–IV redundancy from a single vendor. 20–50 kW standard IT load. ANSI/TIA-942 and Uptime Institute compliant. FAT certificate issued before dispatch.
Pre-integrated and tested under full IT load at the factory. 19" racks, structured cabling, VESDA detection, FM-200 suppression, and environmental monitoring — all installed before dispatch.
Air-cooled for standard compute. Liquid-cooled for GPU clusters and AI inference workloads. Both architectures in one portfolio — specified at order, engineered to your rack power density.
On-site commissioning, preventive maintenance, remote monitoring, and module federation. DEZ commitment extends well past delivery — from first power-up through operational life.
Technical Documentation
Get the CDC Technical Datasheet
Full specifications, tier configurations, cooling options, and deployment process — in a single technical document.

